
Allington Energy From Waste Facility
Colt undertook the supply and installation of a smoke control solution to the Allington Energy to Waste plant located near Maidstone.
Colt installed Seefire, Labyrinth and Meteor natural ventilators as extraction points in the roof and walls of the building for the clearing smoke in the event of a fire at the plant. The natural ventilators provide both day-to-day and smoke ventilation as well as the entry of natural daylight, thus enhancing the working conditions within the facility.
All of the ventilators are controlled using a Colt-designed control panel and a pneumatic control system, which automatically opens all of the ventilators in the event of a fire being detected.
Sector: Building Ventilation, PowerGen & EFW
Location: Kent
Client Requirements: Day-to-day and smoke ventilation

Contact us
We deliver tailored solutions across Smoke Control, Climate Control and Louvres. For more information on how we can help you with your project, get in touch with our team.